So, spring is always a time of some type of growth and rebirth. I knew recently, when I reached my milestone workiversaries, that my blogiversary wasn't far behind.
First, a small cheers for my 20th anniversary in a professional role, and in Facilities Data Management, as it was on the 28th of March, 2000, that I was hired on with the Facilities-Engineering department at Barnes-Jewish Hospital, consistently ranked one of the Top 10 Hospitals in the nation. It was a great place to 'grow up' in the industry, learning from everyone around me, and developing skills (databases, programming) that would serve me well in later roles.
Then, my 5th anniversary, also March 28th, of being hired by the wonderful team at InfoNarus. I am not exaggerating when I say that this was a life-saving occurrence and I will forever be in their debt. Obviously, having worked for them there, and with them in two prior jobs, I wouldn't hesitate to endorse them to anyone who is in search of a competent ARCHIBUS business partner to work with.
Which brings us to today!
The 15th anniversary of this blog. I believe this post marks my 473rd article (aside from the ones published elsewhere, of course).
I suppose I can't count the guest authored articles as my own... although I did provide editing services (wanted or not ;) ) on each of them.
Originally, I started this blog to save time over preparing the Word document and author chasing and editing of the Gatway AUG newsletter I had put out for years prior. But, it also gave me a wider platform for discussing Facilities issues. As I reminisced in my first post, the name of this site has also been a source of amusement for many, and, unlike my actual name, it never gets forgotten.
This site has played a role in most of the jobs I have obtained, allowing me to be visible and help others and display competence (and a wicked sense of humor, which, let's face it, is totally why everyone has hired me or rehired me to work with them).
Show your knowledge folks, even though looking back at my older articles sometimes embarrasses me, as my writing has matured and I have more professional experience to draw from, I still had something to contribute, and it has paid off, no regrets.
Thanks for coming along for the ride!
(I did think about making a list of all of the software I have used, or at least written about, in the past 15 years, but, let's face it, even under quarantine, ain't nobody got time for that.)
images courtesy of vectorstock.com
Melanie Stone's CAD & BIM blog!
This platform will be primarily dedicated to Design Technology
Especially as it relates to Facilities Management (FM / CAFM / CMMS / IWMS)
2020-04-12
2020-04-11
Methods of polylining and Boundary/BPOLY
So, as a Facilities person using AutoCAD (although Revit can sometimes be finicky about 'bounding' properties and having to manually add/adjust bounding lines, too), polylining is a must for all of us.
I still occasionally run across users who are not familiar with the Boundary command (or BPoly).
I use this command to create polylines from enclosed areas, but, you can also create Regions with it.
Obviously, in this process, you have to be aware of the polylining standards being used. Whether it is BOMA or some client-specific method.
If you're plining an area with a predictable pattern (such as a cube farm), setting up construction lines (CONSTRUCTION LINE or RAY) at the midpoint of the walls can be a way to provide yourself with enclosed areas to use the Boundary (BOUNDARY or BPOLY) command on.
Make sure you have a distinct layer set as Current, so that you can isolate it (LAYISO).
If they are the same size, I tend to just draw a rectangle and copy or array as appropriate.
If you have less regular areas, such as an office suite or cafeteria, you will most likely manually polyline the smaller spaces, then use Boundary on the remaining open space (lobby or seating).
Just remember handy tools like the M2P OSNAP, where you can click two points and your pline will snap to the midpoint between them, so you can use RECTANG instead of PL to make your bounding lines, where appropriate.
I actually set up an M2P shortcut on my tool palette, just so I can keep clicking along.
When working in a busy drawing, I tend to keep my running osnaps to a minimum so I don't snap to the wrong thing, and just select more specific snaps from my TP when they are required.
So, once you have your surrounding spaces polylined to make an enclosed space, then you can use BPOLY.
Here the cyan line is my exterior gross, the magenta represents the interior gross line, the blue is for the room boundaries and the yellow is a pair of break lines that prevents islands (Tririga would show an island space as a Child space, but, I believe ARCHIBUS and FM:Systems would freak out about it, islands are a no-no. And, though I am currently a Tririga user, we still avoid islands and do not utilize child spaces with our client.). I feel pretty safe with with an 1/8" gap (.1 if you want to save on the keyboard input).
A tip for generating the exterior gross line is by using the AREA command.
My next step would be to select the interior gross line, a room boundary and one of the yellow breaklines and type LAYISO, so all of the other layers are turned OFF. Run the boundary command, select a point inside of the area, and your polyline is generated.
Now, I did have a reader tell me awhile back that he created a VBA program that would isolate to the desired layers and start the boundary command. I have done a bit of VBA in the past and even had the honor of assisting Lee Ambrosius in his programming labs at AU for years, but, I haven't quite gotten around to making my own program.
But, even if you're not comfortable with programming, you could also speed things up by isolating these layers and use the Layer States dropdown on the expanded Layers panel on the home tab of the ribbon to create a new layer state and while in the Layer States Manager, Export that setting to import into other drawings.
Because, of course, if you're using CAFM/IWMS, you are using the exact same layer names every time.
Happy Polylining, folks!
I still occasionally run across users who are not familiar with the Boundary command (or BPoly).
I use this command to create polylines from enclosed areas, but, you can also create Regions with it.
Obviously, in this process, you have to be aware of the polylining standards being used. Whether it is BOMA or some client-specific method.
If you're plining an area with a predictable pattern (such as a cube farm), setting up construction lines (CONSTRUCTION LINE or RAY) at the midpoint of the walls can be a way to provide yourself with enclosed areas to use the Boundary (BOUNDARY or BPOLY) command on.
Make sure you have a distinct layer set as Current, so that you can isolate it (LAYISO).
Annoyingly, in Autocad 2021, it appears that the default LAYISO behavior is to lock layers, rather than the prior default of turning them off, so you'll have to LAYISO > S to change the settings to O.
If they are the same size, I tend to just draw a rectangle and copy or array as appropriate.
If you have less regular areas, such as an office suite or cafeteria, you will most likely manually polyline the smaller spaces, then use Boundary on the remaining open space (lobby or seating).
Just remember handy tools like the M2P OSNAP, where you can click two points and your pline will snap to the midpoint between them, so you can use RECTANG instead of PL to make your bounding lines, where appropriate.
I actually set up an M2P shortcut on my tool palette, just so I can keep clicking along.
When working in a busy drawing, I tend to keep my running osnaps to a minimum so I don't snap to the wrong thing, and just select more specific snaps from my TP when they are required.
So, once you have your surrounding spaces polylined to make an enclosed space, then you can use BPOLY.
Here the cyan line is my exterior gross, the magenta represents the interior gross line, the blue is for the room boundaries and the yellow is a pair of break lines that prevents islands (Tririga would show an island space as a Child space, but, I believe ARCHIBUS and FM:Systems would freak out about it, islands are a no-no. And, though I am currently a Tririga user, we still avoid islands and do not utilize child spaces with our client.). I feel pretty safe with with an 1/8" gap (.1 if you want to save on the keyboard input).
A tip for generating the exterior gross line is by using the AREA command.
My next step would be to select the interior gross line, a room boundary and one of the yellow breaklines and type LAYISO, so all of the other layers are turned OFF. Run the boundary command, select a point inside of the area, and your polyline is generated.
Confused about the difference between freezing a layer and turning it off?
http://mistressofthedorkness.blogspot.com/2019/09/turning-off-or-freezing-layer-in.html
Now, I did have a reader tell me awhile back that he created a VBA program that would isolate to the desired layers and start the boundary command. I have done a bit of VBA in the past and even had the honor of assisting Lee Ambrosius in his programming labs at AU for years, but, I haven't quite gotten around to making my own program.
But, even if you're not comfortable with programming, you could also speed things up by isolating these layers and use the Layer States dropdown on the expanded Layers panel on the home tab of the ribbon to create a new layer state and while in the Layer States Manager, Export that setting to import into other drawings.
Because, of course, if you're using CAFM/IWMS, you are using the exact same layer names every time.
Happy Polylining, folks!
2020-02-18
Company looking to fill a lot of occupancy planning & related roles
My company sent out another email today, asking for referrals for a host of occupancy planning roles. That tells me these positions are hot.
It took me awhile to get hired on here (massive company and it's hard to get to know the right people in HR at times, and my experiences are a bit limited), but, if anyone is interested in one (or more) of the roles, please let me know, I can start the referral process on our side and get the name of the recruiter in charge of the posting. That will really speed up the process.
(if you don't already have other contact information for me, feel free to email melanie.stone at am.jll.com)
There are locations listed, specific skills and hiring managers might make remote work possible for some of them, you'll just have to inquire and find out.
I adore my team, who are all based in California, and while I don't work with the folks at the local JLL office, they've all been very welcoming.
If these occupancy, space planning or cad manager roles are not up your alley, feel free to search our other open positions, I'd be willing to refer on them as well (there are 95 openings currently with the word CAD in the title).
It took me awhile to get hired on here (massive company and it's hard to get to know the right people in HR at times, and my experiences are a bit limited), but, if anyone is interested in one (or more) of the roles, please let me know, I can start the referral process on our side and get the name of the recruiter in charge of the posting. That will really speed up the process.
(if you don't already have other contact information for me, feel free to email melanie.stone at am.jll.com)
There are locations listed, specific skills and hiring managers might make remote work possible for some of them, you'll just have to inquire and find out.
I adore my team, who are all based in California, and while I don't work with the folks at the local JLL office, they've all been very welcoming.
If these occupancy, space planning or cad manager roles are not up your alley, feel free to search our other open positions, I'd be willing to refer on them as well (there are 95 openings currently with the word CAD in the title).
2020-01-08
RetroCAD video on ARCHIBUS FIMS
One of my colleagues has been posting these awesome videos, setting up really old hardware and operating systems, and running old CAD programs.
His channel is called RetroCAD, and he announces his new videos on Twitter.
So, Robert pinged me and asked if I had or knew of anyone who had an older version of ARCHIBUS.
Now, y'all know I spent most of my illustrious career working in the Facilities Engineering department of one of our nation's top 10 hospitals. Each time we moved our offices (Milton has nothing on us lol), we were put into smaller and smaller spaces and had to purge things. So, I was allowed to bring home a few things that might have otherwise ended up in the dumpster.
Some old digitizer tablets and pucks, some middle-aged Autocad versions & advertisements AND one really old binder of ARCHIBUS F.I.M.S., with a shipping date of 1993.
I'm thrilled that my Shaan Hurley-esque hoarding of arcane architectural artifacts has not been for naught.
Facilities Management is sort of the step-child of the AEC industry, and CAFM (computer-aided facilities management) software does not get a lot of air-time compared to design software, so this is exciting for me.
So, you know how much our industry LOVES acronyms.
BUT, I have a new favorite!
ROVER
Random Online Videodisk Emulation Retrieval
Awesome. lol. Fetch that data!
I hope you enjoy his videos as much as I did. And that, like me, you can appreciate how far user interfaces and relational data has come in the past 20-30 years.
His channel is called RetroCAD, and he announces his new videos on Twitter.
So, Robert pinged me and asked if I had or knew of anyone who had an older version of ARCHIBUS.
Now, y'all know I spent most of my illustrious career working in the Facilities Engineering department of one of our nation's top 10 hospitals. Each time we moved our offices (Milton has nothing on us lol), we were put into smaller and smaller spaces and had to purge things. So, I was allowed to bring home a few things that might have otherwise ended up in the dumpster.
Some old digitizer tablets and pucks, some middle-aged Autocad versions & advertisements AND one really old binder of ARCHIBUS F.I.M.S., with a shipping date of 1993.
I'm thrilled that my Shaan Hurley-esque hoarding of arcane architectural artifacts has not been for naught.
Facilities Management is sort of the step-child of the AEC industry, and CAFM (computer-aided facilities management) software does not get a lot of air-time compared to design software, so this is exciting for me.
So, you know how much our industry LOVES acronyms.
BUT, I have a new favorite!
ROVER
Random Online Videodisk Emulation Retrieval
Awesome. lol. Fetch that data!
I hope you enjoy his videos as much as I did. And that, like me, you can appreciate how far user interfaces and relational data has come in the past 20-30 years.
2019-09-26
Turning Off or Freezing a Layer in Autocad, what's the difference?
Awhile back, I was training a client on how to prepare his files in AutoCAD, prior to registering them in his CAFM/IWMS system, ARCHIBUS. My colleague, James Castruccio, introduced me and spoke very highly of my CAD expertise to the gentleman I was training. While I was conducting the training, over a GoToMeeting, he was performing other work on the project and just listening in.
There was a point at which I was in the Layer Properties Manager palette and James piped up with a question, stating that he had always wondered why we sometimes freeze layers and other times turn them off, and could I educate him as to the differences?
You know, I have been doing this for so long, and have never had to articulate that before, having just sort of internalized the situations in which I would use one over the other.
Reflecting back on the topic, in the past, there were more functionality differences, before computing power and refresh rates, etc caught up to the functions of a full featured CAD program, but, I will try to focus on what is still applicable in more modern releases.
How are Freezing and Turning Off a Layer Similar?
Let's start with the things these two options have in common?
There was a point at which I was in the Layer Properties Manager palette and James piped up with a question, stating that he had always wondered why we sometimes freeze layers and other times turn them off, and could I educate him as to the differences?
You know, I have been doing this for so long, and have never had to articulate that before, having just sort of internalized the situations in which I would use one over the other.
Reflecting back on the topic, in the past, there were more functionality differences, before computing power and refresh rates, etc caught up to the functions of a full featured CAD program, but, I will try to focus on what is still applicable in more modern releases.
How are Freezing and Turning Off a Layer Similar?
Let's start with the things these two options have in common?
- Makes a layer invisible to the user
- Control from the Ribbon (Layers Panel of the Home tab)
- Control from the Layer Properties Manager
- Invoke from the Command Line interface
- LAYFRZ
- LAYOFF
- DWG Compare ignores layers that are Off or Frozen
How are they Different?
LAYOFF - Autocad's memory still holds the geometry
LAYFRZ - Autocad forgets the entities
- this can speed up panning, zooming and regenerating
- is ignored by Extents
- is ignored during Rendering
- this can speed up panning, zooming and regenerating
- is ignored by Extents
- is ignored during Rendering
TIP: When attaching an XREF, it is a good idea to have a dedicated layer for each one. So, you can easily FREEZE the layer and hide all of the external reference's layers, allowing an easy ZE or publish to extents, focusing only on the contents of the drawing you are working in.
LAYON - Does not force a regeneration of the drawing
LAYTHW - Forces a regen
OFF - Can be made the current layer
FROZEN - Cannot be made current
WARNING: When your current layer is turned OFF, any objects you create or insert will immediately become invisible and remain that way, until you turn the layer back on.
FROZEN - Entities are not selectable by any means or methods
OFF - Layers may be selected using the ALL option
WARNING: If you use the ALL option of the SELECT command, and choose to move or erase objects, even the objects on OFF layers will be affected.
OFF - Blocks with multiple layers might still be partially visible, even if the layer the block is inserted on has been turned OFF
FROZEN - Freezing the layer of a block will make all entities invisible
FROZEN - Layers can be frozen by Viewport
OFF - Cannot be controlled independently by VP
Other Layer Controls:
LAYISO invokes the OFF option, not the FROZEN option
LOCK - Unlike freezing or turning off a layer, when you lock a layer, it is still visible, just not able to be manipulated at all
If I have missed any differences or caveats to these to functions, please let me know in the comments.
Oh, and just to prove my street cred as someone who knows her layers, here is a t-shirt that my colleague The CAD Geek had made for me when we went toe to toe as the head of families for AutoCAD Family Feud at AU 2016. Thanks for the great conversation piece, Donnie!
Oh, and just to prove my street cred as someone who knows her layers, here is a t-shirt that my colleague The CAD Geek had made for me when we went toe to toe as the head of families for AutoCAD Family Feud at AU 2016. Thanks for the great conversation piece, Donnie!
2019-07-13
Saving time: Optimizing a Dull Structural Task with Dynamo
I have the pleasure today of hosting a guest blog post, from a longtime Twitter friend that I was fortunate enough to meet up with in person this year, Tom Kunsman! As if working in this industry isn't cool enough, we also bond over our love of Legos and Space Science!
Before we get to Tom's article on saving time with Dynamo, here are some links to past articles from guest authors:
Saving time: Optimizing a Dull Structural Task with Dynamo
Before we get to Tom's article on saving time with Dynamo, here are some links to past articles from guest authors:
- AU2017 Influencer Event - Frank Mayfield
- Greenwashing - Andrew Michler
- FormIt360 + Dynamo - Ryan Cameron
- Revit + 3dsMax Rendering Tutorial - Ryan Cameron
- BIM & The Property Manager Process - Brian Myers
- Moving Forward When Your Company Won't - Matt Stachoni
Saving time: Optimizing a Dull Structural Task with Dynamo
Dynamo is often used to not just create parametric
geometry, but to optimize workflows and maximize project efficiency.
Recently, I was working on a
structural project and was slogging through one of those very repetitive tasks.
This was, of course, the manual editing of a dimension on a beam system, in
order to place the label below them which specifies the number of structural members
and spacing required between them.
As I trudged through this task,
I realized that Dynamo could be leveraged to perform this task, in less time
than it would take to do manually. The data for all the members and spacing was
available in the system family parameters already, so all we had to do was find
a way to tap into it and put it where we want it.
1. Beam Framing Systems
and Their Parameters
First, let’s look at a framing
bay, to understand what information we are trying to gather (notice the values below
the dimension segments).
Initially, when I began working
through this problem, I was going to have users select the beam system, then
the dimension, but relating the two pieces of data proved difficult.
One of the more frustrating
aspects of Revit is the inability to access all of the parameters with in a
project, when you want to use them in tags or with other parameters. Take a
look at the parameters of the beam system. Note that “Centerline Spacing” is
grayed out, which means that the user cannot modify this value.
Thankfully, with Dynamo, we can access this information, along with
the “Number of Lines” value, to apply to the dimension spacing.
NOTE: This access has
the added benefit of eliminating the opportunity for user error.
1. Building a
Solution in Dynamo
Instead of continuing to attempt
to find native Revit options, I decided to turn to the amazing Dynamo community
of users. And, since I was using custom nodes from a package called Rhythm, I
sought assistance directly from the package author, John Pierson.
After brainstorming for a bit,
we came up with this simple graph:
We’ll take a look at each group
of nodes, by function, to understand the logic.
A. Gathering User
Inputs
The first step in our process is
to select the multi-segment dimension that we wish to have the beam system
values written to. This can be done with a simple Select Model Element node and a Number
Slider node. Keep reading, if you aren’t sure why I included the number
slider.
TIP: Renaming a node
can be done simply by double-clicking on the title of the node and typing in a
new label. Renaming nodes can help new Dynamo users more quickly understand
which nodes require user input or selection.
I have renamed the “Select Model
Element” node to read “Select Dimension”, and “Number Slider” has been changed
to “Buffer for Dimension”.
A. Collect and
Compare Beam Systems
Next, we need to grab the
structural beam systems, along with their bounding boxes. This is accomplished
through the use of the following nodes: Categories,
All Elements of Category and Element.BoundingBox.
A. Projecting the
Point and Generating the Bounding Box
Obtaining the underlying
geometry of a multi-segment dimension is difficult. The end result actually
places a point at the mid-point of each segment, and then copyies and offsets
that point until it intersects the beam system.
With this method, Dynamo can
understand which segment of a dimension corresponds to which beam system.
Basically, we are playing laser tag with the dimension and the beam systems,
which actually mimics what a user would do manually.
- Find the related dimension string
- Scan over and locate the beam system to pull data from
- Push the data to the dimension string
By using the Dimension.GetCurve node, we can place a
point at the mid-point and then generate a curve along the normal vector from
that point. This is where the “buffer for dimension” Number Slider gets input to the Geometry.Translate
node.
This translate node places
another dynamo point at a distance away from the midpoint of each of the
selected multi-segment dimensions, which is how we are able to grab the related
beam system. Since the dimension will not intersect the system, we simply
project a point of our own towards it.
The last node in this group is
the BoundingBox.ByGeometry. This
generates the bounding box of the point that was offset from the mid-point of
the dimension line. We will then look to see if the bounding box of this point
intersects with the bounding box of the beam system.
A. Select Objects
to Check
The next step is performed by
this group of nodes, which does an intersection check between the bounding
boxes.
In the BoundingBox.Intersects node we input the Structural Beam System
collection to the boundingBox input
and for the other input we use the
data from dimension point and translation group that was mentioned above.
Flowing from the BoundingBox.Intersects node we use the IndexOf node.
We also use a Code Block node with
a true statement. So, we are ONLY
selecting beam systems that do intersect with the offset midpoint of the
selected dimension.
The remaining nodes: List.AllIndicesOf, List.RemoveItemAtIndex and the second Code Block, with the value of negative one, will remove any Beam
System that may have been misplaced or does not have a corresponding dimension.
A. Get the Index
of the Beam System
Next, we need to get the Beam
System index, and for that we can use the List.GetItemAtIdex
node.
For the list port we feed a wire from the All Elements of Category from when we had selected all of the beam
systems.
With the index port we wire in the
list output from the List.RemoveItemAtIndex
node. Again, this just helps to eliminate
any misplaced beam systems in the current view.
A. Obtain the Dimension
Value of the Beam System
We need to get the dimension
value of the beam system, which is where this group of nodes comes in.
The first step in getting the
dimension value of the beam system is to use the Element.Parameters to get the parameters.
Next, we need to get the String
value from that object with the String
from Object node. This enables us to search for and isolate just the
centerline spacing.
After converting to a string, we
can then search for the centerline spacing by using String.Contains and a Code
Block with “Centerline Spacing”.
NOTE: Dynamo and Revit require
exact spelling and case sensitivity.
This can be done with the List.FilterByBoolMask node. The String.Split node groups the Centerline
Spacing with the associated value associated with the spacing. This is helpful
because we get the user-understandable value of the dimension and not the
decimal value.
A. Assemble the
String
Now it’s time to build the
string (text value) that will be written below the dimension value.
In the first part of this group
we have the Rhythm node BeamSystem.Members,
which obtains the framing members from the beam system. For the Beamsystem input port, we connect a wire
from the List.GetItemAtIndex node while we were .
This gets connected to the Count node, allowing us to obtain the
number of beams from the framing system.
From the group where we obtained
the dimensional value of the beam spacing (the centerline spacing), we connect
the String.Split to the List.LastItem, since we only need the
spacing value from that list.
You can use a simple + (addition) node and a Code Block to add one to the number of
lines. This is what builds our custom below value for dimensions (the part which
used to be manual).
In our final step, we need to
use the Dimension.SetBelowValue node
from the Rhythm package. For the dimension
port, we feed in the Dimension line that we picked all the way back in the
beginning of this logic, with the Select
Dimension node.
Finally, for the belowValue port, we feed in the wire
from the Code Block where we had added the count of the number of beams and the spacing.
A.
Placing the Annotation
After the user runs this script,
Revit places a Dynamo point at the midpoint of each segment of the
multi-segment dimension line as well as a Dynamo point offset from that point.
NOTE: This
offset point needs to be within the beam system you are trying to reference.
NOTE: Remember our
“buffer dimension”? This buffer dimension may need to be modified depending on
how far the user has placed the dimension line from the beam system.
1. Summarizing our
Dynamo Solution
So, the next time you need to
specify the number of members in a framing system, and the spacing between
them, keep in mind that you can automate the process with the following Dynamo
workflow:
A.
Have the user
make selections and input the required tolerance
B.
Collect and
compare your beam systems
C.
Project points
and generate corresponding bounding boxes
D.
Select objects
to check
E.
Obtain the
index of the beam system
F.
Assemble the
data string
G.
Place the data
string below it’s related dimension
Stepping through your process in
a Dynamo graph is important, because not every project is the same. Building
flexibility into our graphs in this manner sets us up for success. As always, I
would encourage you to test any script like this out on a test project, before
using it in production.
I hope this example can
demonstrate to any structural designers and engineers who may not already be
aware, just how they might be able use Dynamo on a project with beam systems. That
might spark other ideas, too, because utilizing a script on a mundane task can
also save so much time and effort.
Much of the logic behind this solution
was provided by John Pierson. Using my initial thoughts and
the resulting idea for improvement, John was able to expand upon what I
provided and assist with the onerous task of obtaining the dimension geometry.
Tom
Kunsman is a structural designer with over 20 years’ experience and
continues to find ways to utilize Dynamo in structural and other disciplines. He
has experience in BIM Execution Plans BxP, Revit family content creation in all
disciplines, and continues learning how to adopt or improve established BIM
workflows.
Twitter: @tkunsman
LinkedIn: https://www.linkedin.com/in/tomkunsman/
John
Pierson is a Design Technology Specialist at Parallax Team and a Revit
certified professional for all disciplines. He is an active member of the
Dynamo community and currently manages the Dynamo package called Rhythm.
Twitter: @60secondrevit
Before you go, please take 3 minutes out of your day to participate in the AUGI Annual Salary Survey. https://www.surveymonkey.com/r/2019AUGISalarySurvey
2018-12-05
BIM 360 Ops - Will it feed data back to Revit?
So, as much buzz as there is around BIM 360 Ops, as a facilities person, my primary concern is longevity and keeping things relevant.
While I know that you can export data from Revit to Ops, I was not sure whether changes you make in Ops can feed back to the Revit model.
So, I ran across this post in the Autodesk Discussion Groups:
Push New Data from Ops back to the Revit Model
The answer provided by katie.murff was that Ops does not (yet) have an API. Although, she did say that a workaround would be to export the information from BIM 360 Ops to a spreadsheet and then import it into Revit.
I suppose it would be up to the people involved in the process and the scale of the data changes as to whether that would be more efficient than just updating the data in both applications manually.
While I know that you can export data from Revit to Ops, I was not sure whether changes you make in Ops can feed back to the Revit model.
So, I ran across this post in the Autodesk Discussion Groups:
Push New Data from Ops back to the Revit Model
The answer provided by katie.murff was that Ops does not (yet) have an API. Although, she did say that a workaround would be to export the information from BIM 360 Ops to a spreadsheet and then import it into Revit.
I suppose it would be up to the people involved in the process and the scale of the data changes as to whether that would be more efficient than just updating the data in both applications manually.
2018-11-23
BIM 360 Ops - First Look
For the past five years, I have been absorbed in the world of ARCHIBUS. So, while I definitely made use of AutoCAD and Revit in conjunction, I sort of lost touch with the direction of some other Autodesk offerings.
Just prior to AU this year, one of my local friends and colleagues, Bill Carney, was discussing a class he was helping to put on. BLD226490 - Lessons Learned While Uploading Data to BIM 360 Ops. I have since logged on to the Autodesk University website and I can see that this year and last year, there are quite a few classes on different topics surrounding the Ops (short for building operations, aka post-construction, post-occupancy).
So, I was reminded that I should take another look at this platform (previously called Autodesk Building Ops) and it's current capabilities. From the Autodesk Website:
The first CAFM system I was involved with was FMDesktop and a mobile component was not really on our radar at that point. Then, when my employer at the time was looking at migrating from our sunset CMMS, and we were transitioning to Maximo, our primary consideration with mobile was attempting to get wifi coverage in our working spaces (equipment floors, equipment rooms in basements and working spaces on the roofs) and ensuring all spaces and items were bar-coded and could be easily looked up, but, realized how vital it was to save man-hours in transit back to the facilities offices.
In my last role, working for an ARCHIBUS business partner, many of our clients were using the ARCHIBUS mobile apps. This is a trusted application nearly as old as I am, so the transition to mobile access has been very data focused. Each iteration of their mobile application (and Web Central) does improve the user interface and therefore usability, but, I think the Ops offering from Autodesk does have an advantage in instinctive use by starting with the mobile and working from there.
The main function of any CMMS (see this past article on my peeves about all the new acronyms to describe this phase of building lifecycle management - TLAs/FLAs for FIM/IWMS) is to be able to retrieve data and report problems. A mobile app puts that data with you in the field, rather than back at your desk. There are other features, easy prioritization, work order updates and flags sent up for missed items.
Now, you do not NEED CAD files or models to manage a facility. The facility is all about the data. That said, the more data is connected to it's source (.dwg/.rvt), the better, and the graphics of a floor plan can help end users and maintenance workers alike. So, my only criticism of BIM 360 Ops is the BIM in the name might make a lot of potential users ignore the product entirely (~coughs~ guilty), but, let's face it, Autodesk will just rename the offering in a year or two anyway.
But, I am happy for their renewed focus on the post-occupancy data and the full building lifecycle, and the user interface looks very intuitive. Easy adoption is the single most important thing in a successful technology implementation, in my opinion.
I encourage everyone to sign up for an AU Online account and search for the course handouts, which will touch on both highlighted implementations and specific tasks (like importing and exporting data).
Just prior to AU this year, one of my local friends and colleagues, Bill Carney, was discussing a class he was helping to put on. BLD226490 - Lessons Learned While Uploading Data to BIM 360 Ops. I have since logged on to the Autodesk University website and I can see that this year and last year, there are quite a few classes on different topics surrounding the Ops (short for building operations, aka post-construction, post-occupancy).
So, I was reminded that I should take another look at this platform (previously called Autodesk Building Ops) and it's current capabilities. From the Autodesk Website:
Autodesk BIM 360 Ops is a mobile-first asset and maintenance management solution that enables general contractors and building owners to realize the value of BIM in building operations. General contractors transform the handover process by connecting BIM asset data created during building design and construction to building operations. Owners begin operations on day one, with a mobile-first solution and the information they need.
The first CAFM system I was involved with was FMDesktop and a mobile component was not really on our radar at that point. Then, when my employer at the time was looking at migrating from our sunset CMMS, and we were transitioning to Maximo, our primary consideration with mobile was attempting to get wifi coverage in our working spaces (equipment floors, equipment rooms in basements and working spaces on the roofs) and ensuring all spaces and items were bar-coded and could be easily looked up, but, realized how vital it was to save man-hours in transit back to the facilities offices.
In my last role, working for an ARCHIBUS business partner, many of our clients were using the ARCHIBUS mobile apps. This is a trusted application nearly as old as I am, so the transition to mobile access has been very data focused. Each iteration of their mobile application (and Web Central) does improve the user interface and therefore usability, but, I think the Ops offering from Autodesk does have an advantage in instinctive use by starting with the mobile and working from there.
The main function of any CMMS (see this past article on my peeves about all the new acronyms to describe this phase of building lifecycle management - TLAs/FLAs for FIM/IWMS) is to be able to retrieve data and report problems. A mobile app puts that data with you in the field, rather than back at your desk. There are other features, easy prioritization, work order updates and flags sent up for missed items.
Now, you do not NEED CAD files or models to manage a facility. The facility is all about the data. That said, the more data is connected to it's source (.dwg/.rvt), the better, and the graphics of a floor plan can help end users and maintenance workers alike. So, my only criticism of BIM 360 Ops is the BIM in the name might make a lot of potential users ignore the product entirely (~coughs~ guilty), but, let's face it, Autodesk will just rename the offering in a year or two anyway.
But, I am happy for their renewed focus on the post-occupancy data and the full building lifecycle, and the user interface looks very intuitive. Easy adoption is the single most important thing in a successful technology implementation, in my opinion.
I encourage everyone to sign up for an AU Online account and search for the course handouts, which will touch on both highlighted implementations and specific tasks (like importing and exporting data).
2017-12-07
AU2017 Influencer Event
It has been awhile since I have posted myself, so I am honored to be able to host another guest post for a fellow AutoCAD Influencer, Frank Mayfield.
After a year of anticipation, AU 2017 has come and passed, and with it, unparalleled learning experiences, along with connecting and reconnecting with new and old friends.
For all its glitz and glamour, Las Vegas is actually a perfect venue for 10,000 geeks to congregate, as its scale and opulence is all powered by its underlying technology. And that technology, after all, is what we’re all about.
Nowhere is this more evident than at the Ka Theater in the MGM Grand. It was my privilege to join an illustrious group of AutoCAD end users, along with key members of the product and marketing teams for a rare, behind the scenes, look at the inner workings of the Ka Theater.
On Monday afternoon, a full day before AU officially started, our group of “Influencers” enjoyed a lively shuttle ride down Las Vegas Boulevard to the MGM Grand, where we were treated to a wonderful reception with our Autodesk hosts. They knew, as we were soon to, that to fully appreciate the magnitude of the Ka Theater, you must see the Cirque De Soleil “Ka” show itself. So, after the reception, the entire team was treated to this incredible production. We returned to the Venetian later that night, jaws agape from a truly magnificent show. Had that been the entire experience, it would have been more than enough, but our story doesn’t end there…
The adventure continues instead the next morning, when our group heads back to the MGM for our exclusive, behind the scenes tour of the Ka Theater. Upon our arrival, the promise of a caffeine pick-me-up was cut short by a long line, and a short time frame.
Soon we found ourselves in the front row of the theater, house lights up, and listening to our guide, the show’s Director of Automation, Mark Castle. He described many of the intricate details of the show and how the moving stage works. The stage production was designed in 2004, and we got to see some of the original drawings – all done in AutoCAD.
Our tour then proceeded three floors down, into the bowels of the Ka Theater. We ended up behind the moving stage, known as the Sand Cliff Deck. This stage is truly the star of the show, as it is able to raise and lower 75 feet by a vertical gantry crane. It can also rotate in three axes with the help of four hydraulic cylinders. During the show, this deck may be level, rotate 360*, or tilt up a full 90* - or anywhere in between!
The Sand Cliff Deck gets its name from a scene in the show where the deck is covered in a special granular cork material which simulates sand. The effect is spot on, but as Mark explained, the cork is the most difficult aspect for the crew, as at the end of the sand scene, the deck literally tilts forward toward the audience, spilling the cork from the stage, and it gets everywhere, including in the machinery. Cleaning up the sand is the most arduous task between shows.
One thing you may not think of while watching the show, but which does strike you from the vantage point shown above, is that the movement of the stage is nearly silent. I could recall the night before being able to hear the performers' footsteps and movement on the stage. It was explained that this quiet movement is accomplished by all of the hydraulic machinery being housed outside of the venue.
Our group continued the tour with another elevator ride; this time six floors up to the show’s control room. The entire show is electronically controlled from here. A relatively small space, our group was squeezed in tightly as we learned about how they manage the show.
Soon, we found ourselves in the practice room. Full of equipment, mats, and harnesses all similar to what is found in the production, the performers spend many hours here honing their skills.
The final stop on our 90-minute tour was the costume department. On our way in, we saw harnesses for the acrobatic performers, their costumes, and as you see below, cabinets lines with perfect head models of each performer who wear a custom fitted mask.
As the costume managers were describing this, I couldn’t help but wonder if a more modern way of accomplishing it might be better? Scan the performer’s head and 3D print it? Even better, scan the head and virtually create the mask, then 3D print that? I’m willing to bet some others in our group had the same thoughts.
One thing we did learn was that the costume department is a very busy place. They’re responsible for creating the costumes of course, but each morning, there is a rack full of things that need to be mended, and they also take care of all the laundering. Plus, backup costumes and alterations are all part of their day’s work.
After an hour and a half of awe inspiring behind the scenes technology, our tour came to an end. I want to thank Autodesk, and specifically the AutoCAD team for putting this together for us.
I’ll leave you with this thought, if you ever get the chance to see the Cirque de Soleil Ka show, I highly encourage you to do so. Not only will you be thoroughly entertained, you may remember this post, and think about all the behind the scenes technology that was designed in AutoCAD. Until our next Influencer adventure, farewell for now.
Here are some past guest posts:
After a year of anticipation, AU 2017 has come and passed, and with it, unparalleled learning experiences, along with connecting and reconnecting with new and old friends.
For all its glitz and glamour, Las Vegas is actually a perfect venue for 10,000 geeks to congregate, as its scale and opulence is all powered by its underlying technology. And that technology, after all, is what we’re all about.
Nowhere is this more evident than at the Ka Theater in the MGM Grand. It was my privilege to join an illustrious group of AutoCAD end users, along with key members of the product and marketing teams for a rare, behind the scenes, look at the inner workings of the Ka Theater.
[This dragon greets you to the entrance of the Ka Theater at the MGM]
On Monday afternoon, a full day before AU officially started, our group of “Influencers” enjoyed a lively shuttle ride down Las Vegas Boulevard to the MGM Grand, where we were treated to a wonderful reception with our Autodesk hosts. They knew, as we were soon to, that to fully appreciate the magnitude of the Ka Theater, you must see the Cirque De Soleil “Ka” show itself. So, after the reception, the entire team was treated to this incredible production. We returned to the Venetian later that night, jaws agape from a truly magnificent show. Had that been the entire experience, it would have been more than enough, but our story doesn’t end there…
[A pic of a panoramic photo, showing the theater and the incredible moving stage]
The adventure continues instead the next morning, when our group heads back to the MGM for our exclusive, behind the scenes tour of the Ka Theater. Upon our arrival, the promise of a caffeine pick-me-up was cut short by a long line, and a short time frame.
[AutoCAD Influencers: Shaan Hurley, Lisa Feldhammer, Alyson Moses, Lynn Allen, David Cohn, Rick Ellis, Curt Moreno, and way in the back, Donnie Gladfelter and Rob Maguire]
Soon we found ourselves in the front row of the theater, house lights up, and listening to our guide, the show’s Director of Automation, Mark Castle. He described many of the intricate details of the show and how the moving stage works. The stage production was designed in 2004, and we got to see some of the original drawings – all done in AutoCAD.
[Original 2004 AutoCAD drawing of the Sand Cliff Deck]
Our tour then proceeded three floors down, into the bowels of the Ka Theater. We ended up behind the moving stage, known as the Sand Cliff Deck. This stage is truly the star of the show, as it is able to raise and lower 75 feet by a vertical gantry crane. It can also rotate in three axes with the help of four hydraulic cylinders. During the show, this deck may be level, rotate 360*, or tilt up a full 90* - or anywhere in between!
[Looking down at the Sand Cliff Deck from the stage level]
[Looking back up to the theater level from behind the Sand Cliff Deck, 3 floors below]
The Sand Cliff Deck gets its name from a scene in the show where the deck is covered in a special granular cork material which simulates sand. The effect is spot on, but as Mark explained, the cork is the most difficult aspect for the crew, as at the end of the sand scene, the deck literally tilts forward toward the audience, spilling the cork from the stage, and it gets everywhere, including in the machinery. Cleaning up the sand is the most arduous task between shows.
One thing you may not think of while watching the show, but which does strike you from the vantage point shown above, is that the movement of the stage is nearly silent. I could recall the night before being able to hear the performers' footsteps and movement on the stage. It was explained that this quiet movement is accomplished by all of the hydraulic machinery being housed outside of the venue.
Our group continued the tour with another elevator ride; this time six floors up to the show’s control room. The entire show is electronically controlled from here. A relatively small space, our group was squeezed in tightly as we learned about how they manage the show.
[Linda Sellheim, Leah Friedman et al squeezed into the control room. On the right, the view from the control room.]
Soon, we found ourselves in the practice room. Full of equipment, mats, and harnesses all similar to what is found in the production, the performers spend many hours here honing their skills.
[All of the smart AutoCAD Influencers may look at the practice vertical peg deck, but the dummies must look away]
The final stop on our 90-minute tour was the costume department. On our way in, we saw harnesses for the acrobatic performers, their costumes, and as you see below, cabinets lines with perfect head models of each performer who wear a custom fitted mask.
[If you ever wondered how to get ahead...]
As the costume managers were describing this, I couldn’t help but wonder if a more modern way of accomplishing it might be better? Scan the performer’s head and 3D print it? Even better, scan the head and virtually create the mask, then 3D print that? I’m willing to bet some others in our group had the same thoughts.
One thing we did learn was that the costume department is a very busy place. They’re responsible for creating the costumes of course, but each morning, there is a rack full of things that need to be mended, and they also take care of all the laundering. Plus, backup costumes and alterations are all part of their day’s work.
[The Influencer group listens intently as the costume managers explain their job]
[Never one for being in the spotlight, Lynn Allen does her best to blend in…]
After an hour and a half of awe inspiring behind the scenes technology, our tour came to an end. I want to thank Autodesk, and specifically the AutoCAD team for putting this together for us.
I’ll leave you with this thought, if you ever get the chance to see the Cirque de Soleil Ka show, I highly encourage you to do so. Not only will you be thoroughly entertained, you may remember this post, and think about all the behind the scenes technology that was designed in AutoCAD. Until our next Influencer adventure, farewell for now.
[The AutoCAD Influencer group outside the Ka Theater]
Frank was most recently the CAD Manager for the Oil, Gas and Chemical division at Benham in Tulsa, Oklahoma. In this role, he oversaw all aspects of the AutoCAD, Plant 3D, Navisworks and CADWorx environments.He has been using AutoCAD since 1986 (v 2.61). Frank is an AutoCAD Certified Professional, a volunteer with AUGI as a forum manager, and a contributing author for the AutoCAD Blog. He is a member of the AutoCAD Customer Council, Autodesk User Panel, the Product Delivery Council, Product Research Community, and the Autodesk Advisors Community.He was part of a select group invited by Autodesk to attend the inaugural CAD Manager Summit in 2015. As a top-rated member of the AutoCAD All-Star Mentor program, he has provided live guidance and answered questions for over 2,500 in-trial users in more than 50 countries worldwide.
Subscribe to:
Posts (Atom)
























